Construction is moving right along on our new store in the Yukon State of New Hampshire. As you can see, winter is coming in force as there’s snow on the ground all around our building. Due to the weather, construction will be stopped until things thaw out in March.
The color choice (required by the Town of Londonderry) of baby blue isn’t our favorite but it still looks pretty sharp. The plywood will be replaced by a glass storefront with our logo on top. Should look great. Our goal was to build the biggest and best looking fireworks store in New Hampshire and I think we’re doing that.
Photos below…
This entry was posted on Thursday, February 5th, 2009 at 4:16 pm and is filed under New Stores. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

